When examining the proposed land for the construction, paying attention to the topographic condition, location context, traffic, access roads to the site as well as the function of the surrounding neighborhood, the width of the passage and the volume of pedestrian traffic, and the width of the sidewalk and the access of roads to land is essential. The construction of such places in intersections, squares, and other prohibited areas mentioned in the laws and adjacent to public gathering centers is not allowed.

        It is necessary for two-way and one-way streets where small stations are constructed to have at least six and three crossing lines, respectively. The minimum area required for installing the station facilities is 8 meters wide by 20 meters long. (Obviously, the pedestrian crossing route should be considered in addition to the above dimensions in width.)
        The land should not be lacated adjacent to schools, educational complexes, medical buildings, hospitals, sanatoriums, relegious buildings, cinemas, as well as sports halls ,hotels, restaurants, office buildings and other buildings and assembly centers designed for more than 50 people, large stores ( More than 2000 square meters), residential houses, telephone exchanges, warehouses where flammable or hazardous materials are stored in large quantities (such as carpentry, logging, straw warehouses, paper, cardboard, fabric, explosives, etc.) .
        The proposed land should not be in the path of flood passage and the surrounding runoff water.
        The selected land should not be in the vicinity of water wells, aqueducts, main waterways, springs, rivers, electricity pylons, pipelines or overlooking them.
        The selected land should not be on or near the faults or on made ground and the place of accumulation of construction debris.
        It is necessary for the construction site to be approved by the relevant local authorities (municipality, traffic police, engineering and safety).
        The construction site for the station should be at least 15 meters on both sides far from shops and service centers that have unprotected flames (blacksmithing, welding, radiator, casting, soldering, bakery, barbecue, etc.).
        There should be no deciduous plants and trees on the ground.
        In the street, access to the station should be coordinated with the city authorities and relevant officials. Necessary measures should be taken regarding the installation of safety equipment (warning lights, straw speed, traffic signs, stop warning signs, etc.) from 200 meters from the entrance of the station. .
        High voltage power supply, gas transmission pipes and railway lines, etc., both underground and above ground should be observed. The area of high voltage power cables should be consulted with the regional power organization regarding the amount of voltage and humidity.
 